How Long Does It Take To Renovate A Kitchen?

How Long Does It Take To Renovate A Kitchen?

How Long Does It Take To Renovate A Kitchen?

How long does it take to renovate a kitchen? This is probably one of the questions you’d ask before scheduling a kitchen remodeling or kitchen renovation project. However, the period is not cast in stone. With fantastic kitchen designs, redesigns, a wide range of fresh finishes, and an array of amazing new appliances, you could literary change your kitchen’s appearance and feel. 

kitchen renovation period

Practically, your kitchen renovation period goes with the scope of the work involved in your project. Whether you’re planning an overhaul, major, or minor renovation project, the time it would take to get your remodeled kitchen varies according to many factors. 

Unlike remodeling other rooms such as Livingroom, a high level of work coordination between plumbers, electricians, carpenters, and other subcontractors makes the remodeling work a bit extensive and time-consuming. Also, some subcontractors have to wait until others are done with their work before proceeding with their pieces. 

For instance, carpenters will always work on the cabinets before a plumber can fix the kitchen sink and plumbing before adding new floor and wall tiles. And later, the electricians can finish their work before painters give the kitchen a polished final outlook. 

Not to mention, the kitchen renovation time frame will also depend on whether you’re changing the footprint significantly or just building on the existing footprint. 


How Long Does It Take To Renovate A Kitchen? Here Are 5 Factors That Could Greatly Affect Your Project’s Timeline.

If you’re looking to have your kitchen reno project done in time and according to your budget, getting your plan as early as you think about the project goes a long way to ensure your project is well-organized and executed in time by the best remodeling professionals. 

However, you shouldn’t worry much about when and how to get a feasible working plan. With the highly professional kitchen renovation experts at Smart Remodeling LLC, you can get a free, precise cost estimated to help you figure out the amount of time and money needed to get your project done to completion.

Plan for Remodeling

Below are some of the factors that can influence the timeframe for your kitchen neon project. 

The scope and type of work to be done

If your renovation project involves minor repairs, fixtures, and finishes, then it could take a few days to get your project completed. But, in the case of complete renovation, the work could take days to weeks. If your kitchen has only external damages, the work could proceed a bit faster, compared to a kitchen full of internal damages that are costly and take time to repair. This can also dictate the time required for the project to be completed. 

The choice of Kitchen design you choose

While some homeowners prefer a simple classical design, if you’re a design enthusiast who wants to stay on top of trends, then a complex modern design would be your design choice. But it also comes with an added cost and timeframe. That said, choosing your design in advance can help you figure out when your project is likely to be completed. As such, your design choice cold makes the work completed quickly or after many weeks.

The size of your kitchen’s space

Every kitchen has a custom size. As such, kitchen sizes will always vary from one home to another. Be it a small or large kitchen; it’s essential to have a design and appliance arrangement that fits snuggly into the kitchen’s space. Practically, a larger kitchen will take more time to renovate than a tiny kitchen and require more materials and labor.

Materials you intent to use for your renovation project

Your choice of kitchen remodel materials can significantly affect your project’s timeline. For instance, if the materials you intend to use for your project are available off the shelf, things will likely move on pretty quickly. But, if you want to use some special materials that require special craftsmanship, or customizations, the project could take a bit longer. 

The current condition of your kitchen

The current condition of your kitchen plays a vital role in determining the scope of work and the amount of time required to get the job done. For instance, if your kitchen has many external and internal damages, the time taken to get it back to its original look and functionality would be longer than if you’re dealing with a few external damages. At Smart Remodeling LLC, you’ll enjoy free in-home consultation, plus free project estimates. 

Pro tip takeaway: Planning your kitchen renovation project and ordering materials before time can help cut the project’s timeframe. 


The Average Timeframe for Kitchen Renovation

Kitchens are not the same size and complexity. And so is the time it takes to get them renovated. Experts estimate an average kitchen renovation project to last 6-9 weeks, depending on the scope of work. 

Larger kitchens with complex refurbishing could take anything between 10 and 12 weeks while carrying out a full larger kitchen remodeling project could take about 3-5 months. With that in mind, you can figure out where your kitchen renovation lies. 

However, this is just an estimated time. The actual timeframe could be anything within the estimated range, or even more depending on the size of the kitchen, design, and complexity of the work.

If you’ve opted for a DIY kitchen renovation, then you should expect a much longer timeframe. 

Pro tip takeaway: Always consult remodeling professionals for accurate quotes and project time frames.

The Average Timeframe for Kitchen Renovation


How Long Does Renovating a Small Kitchen take?

When it comes to remodeling or renovating a small kitchen, you may wonder whether it could take the same time as a standard kitchen. From signing a contract to having the final finish done, it would take about 8 weeks provided you are well-prepared and relying on the already existing footprint.

With no complex renovation work involve, refurbishing a small kitchen can take a relatively short time. The eight weeks span includes having the appliances connected and having the kitchen ready for its function.

Pro tip takes away: Plan for unexpected work and complications for a smooth project progression. 


Why Would Kitchen Renovation Take Such a Long Period? 

Kitchen renovation takes a bit longer than other parts of the house due to the highly moving parts. As such, so many things have to be done within a very short period. 

Unlike other rooms that require basic features such as electricity, heating, and four walls, your kitchen needs more than just that. 

Ideally, your kitchen will need electrical wiring, heating, extensive plumbing, durable flooring, a robust cabinet set, strong countertops, built-in appliances, and user-friendly space. All these features take time to design and install.


Step By Step Kitchen Renovation and Timeline

While kitchen renovation projects vary in size, complexity, and timeframes, a typical renovation project follows the following steps:

Step 1: Planning

Planning your kitchen remodel or renovation project is the first step ever in every project. However, you have to keep many things in mind during the planning phase, including your budget, materials, and estimated project period. Also, you have to think of a kitchen renovation design that will match your kitchen’s architectural designs. In terms of timeline, this would depend entirely on you. 

Step 2: Finding a kitchen renovation contractor

Finding the best kitchen renovation contract takes a bit of a hassle. You should consider referrals, cost determination, and meetings. Also, you consider if you can get a contractor to take up the job at the requirements stage.  However, this will also be at your pace as there’s no standard amount of time to be taken. 

Step 3: Getting the best design for your renovation project

The design process and timeframe depend on your requirements and the scope of the work to be done. However, experts estimate this project phase to last for about 1 to 4 weeks. 

Step 4: Sourcing for products

It would take you 1 to 2 months to order and receive materials for your project due to the lengthy processes of selecting, coordinating, and receiving. Also, this time allows for damage issues, return, and changing of your options. 

Step 5: Demolition and other structural changes

Demolition and other structural changes could take pretty much time. Perhaps you want to move a wall or change the design completely, making the phase even lengthier. On average, this process can take between 3 days and 3 months, depending on the scope of work. 

Step 6: New kitchen layout

This will involve plumbing, electrical work, and moving the appliances to new positions to make your kitchen more convenient. In terms of time taken, this depends on the size of the work and your contractor’s schedule. But it can take from 2 days to 2 weeks.

Step 7: Paintings and trim

Painting takes a shorter period if you get it done before installing cabinets. On average, this can take about 2 to 3 days.

Step 8: Floor and cabinet install

The time to install your floor depends greatly on the type of flooring you want in your kitchen and whether the work is done by a professional or by you. Also, it would be best if you got cabinets installed. On average, this could take about 2 to 3 days to install the flooring and 2-4 days more for cabinets’ installation.  

Step 9: Lighting install

Installing lights at the workspace, under the cabinets, and on the ceilings could be somehow easy. But consult a professional if you feel you cannot do it alone. This takes up to 2 days on average. 

Step 10: Countertop fabrication and install 

If you’re planning to use a fabricated countertop of your choice, this phase could take between 5 days and 28 days. Getting your countertops early can significantly reduce the project time. 

Step 11: Backsplash install

Installing your backsplash could take about 1 to 2 days, depending on the material you intend to use. 

Step 12: Appliances install and finish carpentry

With all the phases mentioned above completed, installing and arranging your appliances is the final step before your kitchen is finally ready for its intended functions. 


Start Your Project Today!

Want to start your kitchen remodeling project today? At Smart Remodeling LLC, we’ve got all your needs catered for. While most kitchen remodels take longer than expected, being able to deliver a perfect renovation project within the shortest time possible. 